防撞墙施工出现质量问题及改进措施
添加时间:2018/7/31 15:09:56     浏览次数:
防撞墙施工出现质量问题及改进措施
Quality problems and improvement measures for the construction of anticollision wall
1防撞墙顶部圆弧部分混凝土缺边掉角的改进措施 
1 Improvement Measures for concrete missing corner of the top part of the anti-collision wall
由于防撞墙顶部圆弧位置混凝土施工中不易振捣密实,模板拆除后,圆弧位置混凝土成型质量较差,混凝土光洁度不良,缺边掉角现象较多,针对这种现象,项目部采用了第二次收面过程中使用小平板振捣器二次复振的方法,有效改善了防撞墙顶部混凝土的密实度,显著提高了防撞墙顶部圆弧位置混凝土的外观质量。
Because the circular arc position of the top of the anticollision wall is not easy to vibrate and compactness in the concrete construction, after the formwork is dismantled, the forming quality of the circular arc position concrete is poor, the concrete finish is bad, and the edge missing angle is many. In view of this phenomenon, the project department adopts the method of using the Ohira Izhen rammer to recover two times during the second times of the process. The compactness of the concrete on the top of the anti-collision wall is effectively improved, and the appearance quality of the concrete at the arc position on the top of the anti-collision wall is remarkably improved.
2防撞墙混凝土裂缝的改进措施 
Improvement measures of concrete crack in 2 collision proof wall
首件防撞墙施工后,防撞墙混凝土顶面出现了较多的微小裂缝现象,经过分析研究,项目部对防撞墙及波形护栏基础分三次进行收面,混凝土初凝前使用铁摸进行最后一遍压光收面处理,通过收面愈合之前混凝土表层产生的塑性裂缝,收面完成后,混凝土顶面及时覆盖一层塑料薄膜,并对混凝土顶面湿水养护,波型护栏基础混凝土收面时,因工作量较大,收面时间较长,现场在波型护栏基础混凝土顶面以上40cm高度搭设了一道土工布,以减小波型护栏基础混凝土表面温度及风速,减小顶面裂缝现象。通过工艺改进,防撞墙顶面裂缝现象显著减少,混凝土表观质量得到有效控制。
After the first anticollision wall construction, there are many small cracks in the concrete top surface of the anticollision wall. After analysis and research, the project department carries out three faces to the anti-collision wall and the foundation of the wave guardrail. Before the concrete initial coagulation, the iron touch is used to handle the final surface of the surface of the concrete surface, which is produced by the surface of the concrete surface before the surface is healed. When the surface of the concrete top surface is covered by a plastic film on the top surface of the concrete, and the concrete top surface is cured by the concrete top surface, when the concrete top surface is covered with wet water, the work load is large and the time of the face is long. The site is set up a geotextile for the 40cm height above the concrete top surface of the wave type guardrail to reduce the wave type protection. The surface temperature and wind speed of the concrete are reduced to reduce the cracks on the top surface. Through the process improvement, the cracks on the top surface of the anti-collision wall are significantly reduced, and the apparent quality of the concrete is effectively controlled.
上一页  防撞墙混凝土的浇筑与振捣  
下一页  防撞墙修复防腐工程工艺
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3